09/05/2024

Regió7 publishes an article about the Torre Lluvià

The newspaper echoes the beginning of the works on the Torre Lluvià.

After the rehabilitation of the building that was carried out in 2015, the interior conditioning and distribution and the improvement of accessibility through the installation of an elevator will now be carried out.

A small annex building will also be rebuilt in order to expose and make the four tubs inside accessible.

See article 

Project data