Manresa
The project responds to a locker rooms program attached to the multisports field, cafeteria, multipurpose room and offices. The building consists of a volume of services, locker rooms and cafeteria, attached to one of the long ends of the existing field.
The locker rooms have a double access to the circulation strip. Another volume contains the 250sqf multipurpose room, divisible through sliding panels in 3 smaller rooms.
Project dateMarch 2001
Completion dateJuly 2003
Architect/sPere Santamaria
Technical architectJosep Maria Corominas (SUMMA)
Structure calculationManuel Arguijo y Associados S.L.
Services calculationGarrós Taller d'Enginyeria
PromoterGestió d'Infraestructures S.A. (GISA) / Departament de Benestar Social de la Generalitat de Catalunya
Area718,90 m2
Budget532.862 €
BuilderGestió i contrucció Roig-Crespo, S.L.