Olèrdola
A structure made up of eight 27.70 meter metal portals is proposed that support the roof that covers the multi-sports court.
The cover is a 10 cm thick Sandwich panel that follows the 7% slope and is supported on the structure by means of IPE 180 type metal straps which at the same time they rest on the trusses.
It is planned in later stages to take advantage of the roof to place photovoltaic panels on the roof. A new concrete stand made up of 3 benches with double lookouts, one on the covered track and the other on a training field where recycled grass will be placed once the football field is removed. In the bleachers area there is an area intended for people with reduced mobility.
Project dateMay 2020
Architect/sPere Santamaria
Structure calculationManuel Arguijo y Asociados S.L.
Services calculationSanti Marés
PromoterOlèrdola Town Hall
Area1.423'52 m2
Budget741.817 €