{"id":10143,"date":"2024-05-15T10:31:43","date_gmt":"2024-05-15T09:31:43","guid":{"rendered":"https:\/\/santamariaarquitectes.cat\/?p=10143"},"modified":"2024-05-15T10:57:45","modified_gmt":"2024-05-15T09:57:45","slug":"regio7-publica-un-article-sobre-la-torre-lluvia","status":"publish","type":"post","link":"https:\/\/santamariaarquitectes.cat\/en\/2024\/05\/regio7-publica-un-article-sobre-la-torre-lluvia\/","title":{"rendered":"Regi\u00f37 publishes an article about the Torre Lluvi\u00e0"},"content":{"rendered":"<p><\/p>\n<p id=\"tw-target-text\" class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Traducci\u00f3\" aria-label=\"Text tradu\u00eft\" data-ved=\"2ahUKEwi9is-IrY-GAxXnAfsDHQJSCtgQ3ewLegQIDBAU\"><span class=\"Y2IQFc\" lang=\"en\">The newspaper echoes the beginning of the works on the Torre Lluvi\u00e0.<\/span><\/p>\n<p class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Traducci\u00f3\" aria-label=\"Text tradu\u00eft\" data-ved=\"2ahUKEwi9is-IrY-GAxXnAfsDHQJSCtgQ3ewLegQIDBAU\"><span class=\"Y2IQFc\" lang=\"en\">After the rehabilitation of the building that was carried out in 2015, the interior conditioning and distribution and the improvement of accessibility through the installation of an elevator will now be carried out.<\/span><\/p>\n<p class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"Traducci\u00f3\" aria-label=\"Text tradu\u00eft\" data-ved=\"2ahUKEwi9is-IrY-GAxXnAfsDHQJSCtgQ3ewLegQIDBAU\"><span class=\"Y2IQFc\" lang=\"en\">A small annex building will also be rebuilt in order to expose and make the four tubs inside accessible.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-10145\" src=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-498x650.jpg\" alt=\"\" width=\"498\" height=\"650\" srcset=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-498x650.jpg 498w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-1149x1500.jpg 1149w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-768x1002.jpg 768w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-1177x1536.jpg 1177w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-1569x2048.jpg 1569w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905-scaled.jpg 1961w\" sizes=\"auto, (max-width: 498px) 100vw, 498px\" \/><\/p>\n<p><a href=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">See article\u00a0 <\/a><a href=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2024\/05\/regio7-240905.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1970\" src=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2018\/01\/pdf_2.png\" alt=\"\" width=\"46\" height=\"46\" srcset=\"https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2018\/01\/pdf_2.png 170w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2018\/01\/pdf_2-60x60.png 60w, https:\/\/santamariaarquitectes.cat\/wp-content\/uploads\/2018\/01\/pdf_2-150x150.png 150w\" sizes=\"auto, (max-width: 46px) 100vw, 46px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/santamariaarquitectes.cat\/en\/projectes\/consolidacio-del-volum-de-les-tines-de-la-torre-lluvia\/\" target=\"_blank\" rel=\"noopener noreferrer\">Project data<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>The newspaper echoes the beginning of the works on the Torre Lluvi\u00e0. After the rehabilitation of the building that was [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10147,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"acf":[],"_links":{"self":[{"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/posts\/10143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/comments?post=10143"}],"version-history":[{"count":5,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/posts\/10143\/revisions"}],"predecessor-version":[{"id":10153,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/posts\/10143\/revisions\/10153"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/media\/10147"}],"wp:attachment":[{"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/media?parent=10143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/categories?post=10143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/santamariaarquitectes.cat\/en\/wp-json\/wp\/v2\/tags?post=10143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}